Sudbury Water District

Recent News

Archive for Uncategorized

Horse Pond Road Water Main Construction Begins Sept 30th

In an ongoing effort to ensure water quality and system reliability water pipe construction on Horse Pond Road  “between” the intersections of Trevor Way thru to Peakham Road begins on Monday, September 30th. What to expect: On Monday, September 30th: Water service will be shut-off on Horse Pond Road between the intersections of Trevor Way and Elliot Road during the […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Emergency Water Pipe Repair, Alta Road

Be advised: An emergency water pipe repair is underway on Alta Road (between the intersections of Wright Road and Clifford Road). Water service on Alta Road (No’s 15-34 approx) will be temporarily shut-off allowing for repair. Service is anticipated to be restored within 8 hours however outage duration is a best-estimate based on past emergency events it is not an exact […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Water Restored to Eddy Street

Water has been fully restored to Eddy Street following a water main repair. We apologize for this inconvenience and are grateful for your patience. We encourage you (if you haven’t already done so) to sign-up for SMART911, an emergency alert system jointly used by the Town, Sudbury PD, Sudbury Fire and the Water District. This is the fastest and most […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Water Restored to Woodland Road

Following an emergency water pipe repair service has been restored to Woodland Road. What to expect once water is restored? Those in close proximity to this area of town may experience fluctuating pressure (air in pipes) or discolored water (mineral sediment lifting from the bottom of the pipes and traveling with the water-flow inside the main.) Once water […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Planned Water Outage, Monday, Aug 19th Wake Robin Road & Juniper Road

Be advised: A planned water outage is scheduled on Monday, August 19th during the hours of 9 am-3pm (approx) on Wake Robin Road and Juniper Road. It is necessary to temporarily suspend water service to this area to allow for connection to the newly installed water main on Morse Road. Outage duration is a best-estimate based on past water infrastructure events it is not […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Morse Road Water Main Project, Planned Outage August 9th

Be advised: Morse Road water main construction is scheduled to begin on Friday, August 9th. Water service on Morse Road (from to Marlboro Road) including Ridge Hill Road, Hunt Road, Juniper Road, Wake Robin Road, Emerson Way, Starview Drive, Musket Lane, Flintlock Lane, and Woodmere Lane will be temporarily suspended on Friday during the hours of 9 am-12 pm allowing for connection to the new main. Outage […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Emergency Water Pipe Repair, Willard Grant Road

Be advised: An emergency water pipe repair is underway on Willard Grant Road. Water service on Willard Grant Road (between the intersections of Cedar Creek Road and Blacksmith Drive, No’s 12-48 approx) will be temporarily interrupted allowing for repair. Service is anticipated to be restored within 8 hours however outage duration is a best-estimate based on past emergency events it […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Morse Road Water Main Project, Planned Outage August 8th

Be advised: Morse Road water main construction is scheduled to begin on Thursday, August 8th. Water service on Morse Road (from to Marlboro Road) including Ridge Hill Road, Hunt Road, Juniper Road, Wake Robin Road, Emerson Way, Starview Drive, Musket Lane, Flintlock Lane, and Woodmere Lane will be temporarily suspended on Thursday during the hours of 9 am-3 pm allowing for connection to the new main. Outage […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Morse Road Water Main Project to begin Wednesday, July 24th

In an ongoing effort to ensure water quality and system reliability water pipe construction on Morse  Road (between the intersections of Ridge Hill Road and Hilltop Road) is scheduled to begin on Wednesday, July 24th. Construction Hours: 7 AM-3 PM, Monday-Friday thru project end, on or about August 30th Morse Road (between Ridge Hill Road and Hilltop Road) will […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →
Page 1 of 19 12345...»