Sudbury Water District

Recent News

Archive for Uncategorized

We’re Moving

EFFECT SEPTEMBER 28TH In preparation of our facility renovation project Sudbury Water District administration offices will be temporarily relocating to: 345 Boston Post Road, Suite A (Sudbury Place Complex) Offices will be closed on Friday, September 28th thru Monday October 1st to accommodate the move. Our 199 Raymond Road offices will be closed to the […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Water Restored to Concord Road Area

Following an emergency pipe repair water has been restored to Concord Road, Confidence Way and Church Street. In an effort to lessen mineral sediment impact, area hydrant flushing is underway. Although these efforts will reduce sediment amount, it is unlikely all traces will be removed. Homes and businesses in close proximity to this area may experience […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Emergency Water Pipe Repair, Concord Road

Be advised: An emergency water pipe repair is underway at 15 Concord Road. Water service on Concord Road (between the intersection’s of Codjer Lane thru to Boston Post Road) including Confidence Way and Church Street will be temporarily interrupted allowing for repair. Service is anticipated to be restored within 5 hours however outage duration is a best-estimate based on past emergency […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Codjer Lane / Horse Pond Road Water Main Surveying

In preparation of water main replacement project’s scheduled for Summer 2019 surveying of existing water infrastructure on Codjer Lane and Horse Pond Road is underway. What should you expect? Residents of Codjer Lane and Horse Pond Road may observe District staff marking existing pipeline and water infrastructure including gate valves, curb boxes and service connections with blue wash-away paint and/or blue […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Maynard Road Paving Project Begins July 9th

  Milling and paving Maynard Road (between Fairbanks Road and Wyman Drive) begins Monday, July 9th. Construction hours are Monday-Friday from 7 am-3:30 pm. Anticipated completion date is Friday, July 13th. Commuters should expect delays or seek an alternate route. Contact the Sudbury Water District business office at 978-443-6602 to address questions or concerns about this project.   […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Maynard Road Water Pipe Construction begins, Wednesday June 6th

In an ongoing effort to ensure water quality and system reliability water pipe construction on Maynard Road (between the intersections of Fairbank Road through to Wyman Drive) is scheduled to begin on Wednesday, June 6th. Construction Hours: 9 AM-4PM, Monday-Friday thru project end, on or about June 20th Construction will begin on Maynard Road (at the intersection of Fairbank […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Zone II Unidirectional Water Main Flushing Begins May 31

As an essential part of our system’s maintenance program during the spring and fall of each year, Sudbury Water District opens hydrants in an effort to clear our  water mains of sediment and mineral build up. This practice not only extends the life of our water mains but improves water quality. To cleanse our distribution system, hydrants are systematically opened […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →

Mandatory Non-essential Outdoor Water Use Restriction

Public Notice Mandatory Non-essential Outdoor Water Use Restriction For Residential & Commercial Customers In accordance with the Sudbury Water District’s Water Management Act Permit, the District has implemented a mandatory non-essential outdoor water use restriction from May 1, 2018 to September 30, 2018. Non-essential water use will only be allowed before 9:00 a.m. and after […]

Continue Reading →

Posted in: Uncategorized

Leave a Comment (0) →
Page 5 of 18 «...34567...»