Sudbury Water District

Recent News

Codjer Lane Water Main Replacement Project Begins Monday, Dec 2nd

CODJER LANE WATER MAIN PROJECT

On Monday, December 2nd water service will be temporarily suspended during the hours of 9 AM-3 PM (approx.) on Codjer Lane, Walk-up Road and Concord Road (No’s 88 thru to 160) to allow for cutting and capping the old water main.

Construction Hours: 7:30 AM-4 PM, Monday-Friday thru project end, on or about December 20th.

Codjer Lane will be closed to thru traffic during construction hours, Sudbury Police detail officers will be on-site to facilitate vehicle detours and pedestrian traffic.

The construction zone will remain-open to residents of and business located on Codjer Lane, school buses and emergency vehicles. Safety is our priority, occasional travel delays should be expected allowing for construction equipment to be moved outside of the travel lane.

Periodic planned water outages may be necessary. Stay informed by enrolling to receive important alerts via Reverse-9-1-1 an emergency notification system shared between the District and Town Departments.

Access to driveways and entranceways will be maintained. In the event it becomes necessary to block a driveway/entranceway for a short period of time (usually less than 4 hours) our contractor will attempt to contact the home/business owner to coordinate and minimize inconveniences.

Construction is weather permitting and subject to change.

We thank you in advance for your patience and cooperation.

Leave a Comment (0) ↓