Sudbury Water District

Recent News

Water Main Connection today: Nobscot at Grouse Hill, Nobscot at Mahoney Farms & Nobscot at South Meadow Drive

Connection to the new water main on Nobscot Road at Mahoney Farms (30 Nobscot Road) and Grouse Hill (32 Old Framingham Road) will occur today. Water service at these locations will be temporarily interrupted during the approximate hours of 8:30 a.m. – 12 p.m. Connection to the new water main on Nobscot Road at South […]

Continue Reading →
Leave a Comment (0) →

Emergency Water Main Repair, Firecut Lane

Emergency Water Main Repair, Firecut Lane Be advised: An emergency water main repair is underway on Firecut Lane. Water service on Firecut Lane  and Aaron Road will be temporarily interrupted allowing for repair. Service is anticipated to be restored to this area within six-hours (approximately 12 pm – 6 pm) Residence located on Firecut Lane and Aaron […]

Continue Reading →
Leave a Comment (0) →

Emergency Water Main Repair, Nobscot Road

Emergency Water Main Repair, Nobscot Road Be advised: An emergency water main repair is underway on Nobscot Road. Water service on Nobscot Road & Old Framingham Road will be temporarily interrupted allowing for repair. Service is anticipated to be restored to this area within three-hours (approximately 12 pm – 3 pm) Residence located on Nobscot Road & Old Framingham […]

Continue Reading →
Leave a Comment (0) →

4th Quarter Water Charges (Feb-May)

4th quarter (Feb-May) water bills have been issued. Payments may be made traditionally, online www.sudburywater.com or electronically with your bill pay service; when issuing payment electronically kindly reference your account number and designate Sudbury Water District as the payee. To avoid late fees please submit payment in full on or before July 7th.  In addition to receiving a traditional paper invoice, we would like to remind […]

Continue Reading →
Leave a Comment (0) →

As the Temperatures Rise, Demand for Water Increases

Spring has finally arrived and with it comes warmer temperatures and an increased demand for water. To ensure a sufficient supply of drinking water is available, as it becomes necessary, pumping stations that have been dormant over the winter period will be brought on-line for the season. The increase in flows and larger volumes of water traveling through our pipes may cause mineral sediment […]

Continue Reading →
Leave a Comment (0) →

2014 Water Main Replacement Project

Construction to replace existing water mains on Dudley Road, Nobscot Road, Boston Post and Horse Pond Road is scheduled to begin Monday, April 7th. Starting Point: DUDLEY ROAD at the intersection of Boston Post Road through to Nobscot Road. From Dudley Road construction will continue onto NOBSCOT ROAD at the intersection of Dudley Road through to Boston Post Road. From Nobscot Road […]

Continue Reading →
Leave a Comment (0) →

Pump Station No 8 (East Street)

Pump Station No 8, (East Street) to be brought on-line, Thursday, January 9th at 12 p.m. (approx.): Homes and businesses in close proximity to this area may briefly experience discolored water due to increased flows and larger volumes of water traveling through our pipes causing mineral sediment to lift from the bottom of the mains and flow with the water. In an effort to lessen […]

Continue Reading →
Leave a Comment (0) →

Water Main Flushing Update

Flushing Route for Tuesday, November 12 (continuing until further notice) Routine Daytime Flushing (approx. 9 a.m.-3 p.m.) will originate on Fairbank Road continuing onto Hudson Road (at Fairbank Road) through to the Sudbury/Stow town line. Flushing will include but is not limited to: Fairbank Road, Hudson Road (at Fairbank Road) through to the Sudbury/Stow town line, Spruce Lane, Ronald Road, Barbara […]

Continue Reading →
Leave a Comment (0) →
Page 27 of 28 «...10202425262728