Skip to content
978-443-6602|customerservice@sudburywater.com
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL WATER METER READING
  • EMERGENCY NOTIFICATIONS
Sudbury Water District Logo
  • HOME
  • WATER DISTRICT
    • Sudbury Water District 90th Annual Meeting
      • 90th Annual Election Results, May 19, 2026
      • 90th Annual Meeting Warrants
      • 90th Annual Report
    • Elected Officials
    • History
      • Chapter 100
      • Sudbury Water District Bylaws
    • Meetings
      • Calendar
    • News
    • Procurement Policy
    • Standards and Specifications
    • System Rules and Regulations
    • Water System Map
    • Projects
      • East Street Water Treatment Plant / PFAS Removal Project
  • MY WATER
    • FAQs
      • Links
    • Rates and Fees
      • High Water Bill?
    • Water Quality
      • Important Information About Emergency Water Main Repairs and Unexpected Water Service Outages
      • How to Prepare for a Temporary Water Service Outage, During Planned Water Utility Repair Work
      • Revised Total Coliform Rule Violation Notice of Noncompliance
      • Water Mains Breaks, Repairs and Temporary Outages
      • Backflow Prevention
        • Commercial, Industrial and Institutional Backflow
      • Flushing
      • Keep Your Drinking Water Safe
      • Lead in Drinking Water
        • Lead and Copper Rule Revisions (LCRR): Service Line Material Inventory
      • PFAS and the Sudbury Water District’s Drinking Water Supply
        • New EPA PFAS Regulation Summary
        • PFAS Sample Results
      • Source Water Assessment and Protection (SWAP) Report
    • Final Water Meter Reading
    • GIS Map
    • Water Service Infrastructure – Ownership and Responsibility
    • Water Contractor List (active/licensed)
    • Abatement Policy
    • Meter Replacement Program
    • Outdoor Water Restrictions
    • Download Water Use Records for Title V
    • Adopt a Hydrant
  • APPLICATIONS & FORMS
    • Abatement Application
      • Abatement Policy
    • Backflow Prevention Device Design Data Sheet (BPDDDS)
    • Final Water Meter Reading Application
    • General Water Permit Application
    • GWPA Start-to-Finish Guide
    • Hydrant Fire Flow Permit Application
    • Hydrant Meter Assembly Rental Permit Application
    • Water Contractor’s License Application
  • BID SPECS
    • RFP 27-23 Green Sand Filter Rehabilitation and Media Replacement at Raymond Road Water Treatment Plant
      • Addendum 1 – RFP 27-23
      • RFQ 27-23 BID RESULTS
  • VIEW MY ACCOUNT / PAY BILL
  • CONTACT
    • Administration
    • Board of Water Commissioners
    • After Hours Emergency Contact
  • EMPLOYMENT OPPORTUNITIES
    • Finance Director
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL WATER METER READING
  • EMERGENCY NOTIFICATIONS
IFB 22-18 SCADA SYSTEM UPGRADES PROJECTSudbury Water District2022-02-25T10:11:57-05:00

The Sudbury Water District, is accepting sealed bids for the SCADA System Upgrades, Sudbury Water District, Sudbury, Massachusetts in accordance with the provisions of M.G.L. Chapter 30B.

The Work under this Contract includes, but is not necessarily limited to, the replacement of the Sudbury Water District’s radio telemetry systems at four well stations, two water treatment plants (WTPs), and two storage tank sites; replacement of two existing SCADA PCs with two SCADA servers; furnishing new SCADA software; providing chemical day tank high level float switches at three facilities; providing a SCADA PC Workstation in the District Office; and coordination with the Application Engineer. All proposed work shall be sequenced as described in the Contract Drawings.

A non-mandatory pre-bid meeting will be held at the Water District Office, 199 Raymond Road, Sudbury, MA 01776 on February 10, 2022 at 10:00 a.m. Bidders are strongly encouraged to attend the pre-bid meeting.

Sealed Bids from Contractors will be received until 2:00 PM prevailing time on February 24, 2022. All bids shall be submitted online at www.Projectdog.com and entitled “SCADA System Upgrades, Sudbury Water District, Sudbury, Massachusetts”.

All electronic bids are compiled in real time upon bid close and published forthwith on Projectdog. Official bid tabulations shall be posted on ProjectDog.

All bids shall be submitted electronically online at www.Projectdog.com no later than the date and time specified above. Hard copy bids will not be accepted by the Awarding Authority.

LATE BIDS WILL NOT BE CONSIDERED. The DISTRICT reserves the right to reject any and all bids as determined to be in the best interests of the DISTRICT and to waive minor informalities.

Addendum # 1

Addendum # 2

Addendum # 3

RELATED LINKS

  • Water Quality
  • PFAS and the Sudbury Water District’s Drinking Water Supply
  • FAQs
  • Backflow Prevention

NEWS FEED

  • Emergency Water Main Repair/Temporary Service Outage, Wednesday, October 14th: Maynard Road, Minebrook Road and Crescent Lane
  • Emergency Water Main Repair/Temporary Service Outage, Monday, September 26th: King Philip Road
  • Water Main Flushing Begins: Monday, September 28th

CONTACT INFO

Phone (978) 443-6602

Mailing Address
199 Raymond Road
P.O. Box 111
Sudbury, Massachusetts 01776

Phone: 978-443-6602 »
Fax: 978-443-9587 »
Email: customerservice@sudburywater.com

NEWS FEED

  • Emergency Water Main Repair/Temporary Service Outage, Wednesday, October 14th: Maynard Road, Minebrook Road and Crescent Lane October 14, 2026
  • Emergency Water Main Repair/Temporary Service Outage, Monday, September 26th: King Philip Road September 28, 2026
  • Water Main Flushing Begins: Monday, September 28th September 24, 2026

RESOURCES

  • Water Quality
  • FAQS
  • Backflow Prevention

The Sudbury Water District is an independent municipal entity established by an Act of the Massachusetts Legislature in 1934.
It is separate and distinct from the Town of Sudbury, and is not affiliated with the Town of Sudbury’s Department of Public Works.

© 2026 Sudbury Water District

Page load link
Go to Top