Skip to content
978-443-6602|customerservice@sudburywater.com
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL METER READING
  • EMERGENCY NOTIFICATIONS
Sudbury Water District Logo
  • HOME
  • WATER DISTRICT
    • Sudury Water District 89th Annual Meeting & Election
      • 89th Annual Election Results, May 20, 2025
      • Positions Available – 89th Annual Election
      • 89th Annual Meeting Warrants
      • Voting & Absentee Ballot 2025
      • 89th Annual Report
    • Elected Officials
    • History
      • Chapter 100
      • Sudbury Water District Bylaws
    • Meetings
      • Calendar
    • News
    • Procurement Policy
    • Standards and Specifications
    • System Rules and Regulations
    • Water System Map
    • Projects
      • East Street Water Treatment Plant / PFAS Removal Project
  • MY WATER
    • FAQs
      • Links
    • Water Quality
      • Fiscal Year 2025 Dead-End Hydrant & Gate Valve Installation Project
      • How to Prepare for a Temporary Water Outage During Scheduled Utility Construction
      • Water Mains Breaks, Repairs and Temporary Outages
      • 2021 Water Quality Report
      • Backflow Prevention
        • Commercial, Industrial and Institutional Backflow
      • Flushing
      • Keep Your Drinking Water Safe
      • Lead in Drinking Water
        • Lead and Copper Rule Revisions (LCRR): Service Line Material Inventory
      • PFAS and the Sudbury Water District’s Drinking Water Supply
        • New EPA PFAS Regulation Summary
        • PFAS Sample Results
      • Source Water Assessment and Protection (SWAP) Report
    • Final Meter Reading
    • GIS Map
    • Licensed Water Contractor’s
    • High Water Bill?
    • Abatement Policy
    • Meter Replacement Program
    • Outdoor Water Restrictions
    • Owner’s Responsibility
    • Rates and Fees
    • Download Water Use Records for Title V
    • Adopt a Hydrant
  • APPLICATIONS & FORMS
    • Abatement Application
      • Abatement Policy
    • Backflow Device Design Data Sheet
    • Final Meter Reading Application
    • General Water Permit Application
    • Hydrant Fire Flow Permit Application
    • Hydrant Meter Assembly Rental Permit Application
    • Water Contractor’s License Application
  • BID SPECS
    • Invitation for Bids (IFB) SWD 26-11 / Well #s 3, 8, and 10 Redevelopment
      • Bid Results – IFB 26-11
  • VIEW MY ACCOUNT / PAY BILL
  • CONTACT
    • Administration Office
    • After Hours Emergency Contact

Modified Water Main Flushing Begins October 14th

Restricted to Dead End Water Mains / COVID-19

This fall our flushing program has been modified to minimize discoloration of water while residents remain home due to the COVID-19 outbreak.  Only dead end water mains will be flushed (typically located on cul de sacs.)  Two staff will be flushing simultaneously; one beginning on the North side (Route 117 area) of Town and move south/east, and the second beginning in the Landham Road area moving north/west.

  • Flushing Begins: Wednesday, October 14th
  • Flushing Hours: 7:30 am – 3:00 pm each weekday
  • Anticipated End Date: Friday, November 20th
  • Flushing is weather permitting

Flushing may impact the water in homes. Before running washing machines during this time residents should ensure their water is not cloudy, which indicates the presence of minerals. Residents should also bypass their filtering systems, including water softeners and refrigerator filters for a day or two following the flushing. If water appears cloudy, residents should run cold water in a bathtub until running clear.

Read More
By Sudbury Water|2020-10-14T10:30:44-04:00October 14th, 2020|Uncategorized|Comments Off on Modified Water Main Flushing Begins October 14th

Share This Story, Choose Your Platform!

FacebookXRedditLinkedInWhatsAppTumblrPinterestVkEmail

CONTACT INFO

Phone (978) 443-6602

Mailing Address
199 Raymond Road
P.O. Box 111
Sudbury, Massachusetts 01776

Phone: 978-443-6602 »
Fax: 978-443-9587 »
Email: customerservice@sudburywater.com

NEWS FEED

  • Planned System Maintenance – Monday, December 1 December 1, 2025
  • Water Utility Repair/Temporary Outage: Brewster Road November 12, 2025
  • Water Utility Repair/Temporary Water Outage: Maynard Farm Road (House No. 123) and Deer Pond Road (House Nos. 5-36) October 8, 2025

RESOURCES

  • Water Quality
  • FAQS
  • Backflow Prevention

The Sudbury Water District is an independent municipal entity established by an Act of the Massachusetts Legislature in 1934.
It is separate and distinct from the Town of Sudbury, and is not affiliated with the Town of Sudbury’s Department of Public Works.

© 2025 Sudbury Water District

Page load link
Go to Top