 FY2025:

  • Completed the Raymond Road WTF/PFAS Filtration system in August 2024.
  • Awarded contract for the East Street WTF/PFAS Filtration system to Barbato Construction. Project completion date is anticipated for August 2026.
  • Evaluation and Preliminary Design for PFAS mitigation system for wells 4 & 6.
  • Conducted a study/evaluation for an emergency and long-term water supply connection(s) with surrounding towns and the Massachusetts Water Resource Authority (MWRA).
  • Participated in the MWRA Metrowest Expansion Study.
  • Well 5 – preliminary design for well replacement. Funded via Housing Choice Grant Program. 
  • Installed 80-feet of new 12-inch ductile iron water main on Dutton Road, Peakham Road, and Boston Post Road for the Eversource High Voltage Line Project.
  • Completed MassDEP requirement for lead Service Line inventory. Funded through MassDEP grant.
  • Asset Management Program, 90% completed. Funded by MassDEP grant program. 
  • Installed 23 new fire hydrants on dead-end streets and cul-de-sacs in Town.
  • Conducted a leak detection survey of the entire water distribution system. The survey is necessary to locate and eliminate leaks from the system.
  • Participation in leak-detection pilot program with 50 sound listening devises securely mounted fire hydrant at various locations within Town.
  • Completed MassDEP requirement for Lead Service Line Inventory
  • Completed UCMR 5 sampling.
  • Updated Water GIS Mapping.