Skip to content
978-443-6602|customerservice@sudburywater.com
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL WATER METER READING
  • EMERGENCY NOTIFICATIONS
Sudbury Water District Logo
  • HOME
  • WATER DISTRICT
    • Sudbury Water District 90th Annual Meeting
      • 90th Annual Election Results, May 19, 2026
      • 90th Annual Meeting Warrants
      • 90th Annual Report
    • Elected Officials
    • History
      • Chapter 100
      • Sudbury Water District Bylaws
    • Meetings
      • Calendar
    • News
    • Procurement Policy
    • Standards and Specifications
    • System Rules and Regulations
    • Water System Map
    • Projects
      • East Street Water Treatment Plant / PFAS Removal Project
  • MY WATER
    • FAQs
      • Links
    • Rates and Fees
      • High Water Bill?
    • Water Quality
      • Important Information About Emergency Water Main Repairs and Unexpected Water Service Outages
      • How to Prepare for a Temporary Water Service Outage, During Planned Water Utility Repair Work
      • Revised Total Coliform Rule Violation Notice of Noncompliance
      • Water Mains Breaks, Repairs and Temporary Outages
      • Backflow Prevention
        • Commercial, Industrial and Institutional Backflow
      • Flushing
      • Keep Your Drinking Water Safe
      • Lead in Drinking Water
        • Lead and Copper Rule Revisions (LCRR): Service Line Material Inventory
      • PFAS and the Sudbury Water District’s Drinking Water Supply
        • New EPA PFAS Regulation Summary
        • PFAS Sample Results
      • Source Water Assessment and Protection (SWAP) Report
    • Final Water Meter Reading
    • GIS Map
    • Water Service Infrastructure – Ownership and Responsibility
    • Water Contractor List (active/licensed)
    • Abatement Policy
    • Meter Replacement Program
    • Outdoor Water Restrictions
    • Download Water Use Records for Title V
    • Adopt a Hydrant
  • APPLICATIONS & FORMS
    • Abatement Application
      • Abatement Policy
    • Backflow Prevention Device Design Data Sheet (BPDDDS)
    • Final Water Meter Reading Application
    • General Water Permit Application
    • GWPA Start-to-Finish Guide
    • Hydrant Fire Flow Permit Application
    • Hydrant Meter Assembly Rental Permit Application
    • Water Contractor’s License Application
  • BID SPECS
    • RFP 27-23 Green Sand Filter Rehabilitation and Media Replacement at Raymond Road Water Treatment Plant
      • Addendum 1 – RFP 27-23
      • RFQ 27-23 BID RESULTS
  • VIEW MY ACCOUNT / PAY BILL
  • CONTACT
    • Administration
    • Board of Water Commissioners
    • After Hours Emergency Contact
  • EMPLOYMENT OPPORTUNITIES
    • Finance Director
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL WATER METER READING
  • EMERGENCY NOTIFICATIONS

Codjer Lane Water Main Replacement Project

In an ongoing effort to ensure water quality and system reliability water main replacement on Codjer Lane (between Union Avenue and Concord Road) begins on Monday, June 1st.

What you should expect:

  • On Monday, June 1st water service will be temporarily suspended during the hours of 9 AM-3 PM (approx.) on Codjer Lane, Walk-up Road and Concord Road (No’s 88 thru to 160) to allow for cutting and capping the old water main.
  • Construction Hours: 7:30 AM-4 PM, Monday-Friday thru project end, on or about June 30th.
  • Codjer Lane will be closed to thru traffic during construction hours, Sudbury Police detail officers will be on-site to facilitate vehicle detours and pedestrian traffic.
  • The construction zone (Codjer Lane between the intersections of Concord Road and Union Avenue) will remain-open to residents of and business located on Codjer Lane and emergency vehicles.
  • Safety is our priority, occasional travel delays should be expected allowing for construction equipment to be moved outside of the travel lane.
  • Periodic planned water outages may be necessary. Stay informed, sign-up to receive important alerts via Reverse-9-1-1 at www.sudburywater.com.
  • Access to driveways and entrance-ways will be maintained. In the event it becomes necessary to block a driveway/entrance-way for a short period of time (usually less than 4 hours) our contractor will attempt to contact the home/business owner to coordinate and minimize inconveniences.
  • Every effort will be made to reduce traffic delays however commuters should expect some degree congestion.

We thank you in advance for your cooperation.  If you have any questions or comments, please contact our administration office at 978-443-6602, during regular business hours.

By Sudbury Water District|2020-06-02T09:44:10-04:00June 2nd, 2020|Uncategorized|Comments Off on Codjer Lane Water Main Replacement Project

Share This Story, Choose Your Platform!

FacebookXRedditLinkedInWhatsAppTumblrPinterestVkEmail

CONTACT INFO

Phone (978) 443-6602

Mailing Address
199 Raymond Road
P.O. Box 111
Sudbury, Massachusetts 01776

Phone: 978-443-6602 »
Fax: 978-443-9587 »
Email: customerservice@sudburywater.com

NEWS FEED

  • Emergency Water Main Repair/Temporary Service Outage, Wednesday, October 14th: Maynard Road, Minebrook Road and Crescent Lane October 14, 2026
  • Emergency Water Main Repair/Temporary Service Outage, Monday, September 26th: King Philip Road September 28, 2026
  • Water Main Flushing Begins: Monday, September 28th September 24, 2026

RESOURCES

  • Water Quality
  • FAQS
  • Backflow Prevention

The Sudbury Water District is an independent municipal entity established by an Act of the Massachusetts Legislature in 1934.
It is separate and distinct from the Town of Sudbury, and is not affiliated with the Town of Sudbury’s Department of Public Works.

© 2026 Sudbury Water District

Page load link
Go to Top