Skip to content
978-443-6602|customerservice@sudburywater.com
  • VIEW MY ACCOUNT / PAY BILL
  • FINAL METER READING
  • EMERGENCY NOTIFICATIONS
Sudbury Water District Logo
  • HOME
  • WATER DISTRICT
    • Sudury Water District 89th Annual Meeting & Election
      • Positions Available – 89th Annual Election
      • 89th Annual Meeting Warrants
      • Voting & Absentee Ballot 2025
      • 89th Annual Report
    • Elected Officials
    • History
      • Chapter 100
      • Sudbury Water District Bylaws
    • Meetings
      • Calendar
    • News
    • Procurement Policy
    • Standards and Specifications
    • System Rules and Regulations
    • Water System Map
    • East Street Water Treatment Plant / PFAS Removal Project
  • MY WATER
    • FAQs
      • Links
    • Water Quality
      • Fiscal Year 2025 Dead-End Hydrant & Gate Valve Installation Project
      • How to Prepare for a Temporary Water Outage During Scheduled Utility Construction
      • Water Mains Breaks, Repairs and Temporary Outages
      • 2021 Water Quality Report
      • Backflow Prevention
        • Commercial, Industrial and Institutional Backflow
      • Flushing
      • Keep Your Drinking Water Safe
      • Lead in Drinking Water
        • Lead and Copper Rule Revisions (LCRR): Service Line Material Inventory
      • PFAS and the Sudbury Water District’s Drinking Water Supply
        • New EPA PFAS Regulation Summary
        • PFAS Sample Results
      • Source Water Assessment and Protection (SWAP) Report
    • Final Meter Reading
    • GIS Map
    • 2025 Licensed Water Contractor List
    • High Water Bill?
    • Abatement Policy
    • Meter Replacement Program
    • Outdoor Water Restrictions
    • Owner’s Responsibility
    • Rates and Fees
    • Calculating My Water Bill
    • Download Water Use Records for Title V
    • Adopt a Hydrant
  • APPLICATIONS & FORMS
    • Final Meter Reading Application
    • Backflow Device Design Data Sheet
    • General Water Permit Application
    • Hydrant Meter Assembly Rental Permit Application
      • Hydrant Fire Flow Permit Application
    • Abatement Application
      • Abatement Policy
    • Water Contractor’s License Application
  • BID SPECS
    • Request for Quotes / Inspections of Water Storage Tanks
  • VIEW MY ACCOUNT / PAY BILL
  • CONTACT
    • Administration Office
    • After Hours Emergency Contact

Water Main Flushing Advances to Section 3, May 3rd

Water main flushing advances to Section 3 on Wednesday, May 3rd and will  be limited to dead-end water mains. The flushing route will  begin with Section 1 and travel systematically to each dead-end water main ending with Section 5. Flushing is an essential part of our system’s maintenance program, this practice improves water quality and helps to extend the life of our water mains.

Section1 – Complete
Section 2 – Complete
Section 3 – Flushing Street Order

Learn More About Water Main Flushing

By Sudbury Water District|2023-06-13T14:15:43-04:00May 3rd, 2023|Flushings|Comments Off on Water Main Flushing Advances to Section 3, May 3rd

Share This Story, Choose Your Platform!

FacebookXRedditLinkedInWhatsAppTumblrPinterestVkEmail

CONTACT INFO

Phone (978) 443-6602

Mailing Address
199 Raymond Road
P.O. Box 111
Sudbury, Massachusetts 01776

Phone: 978-443-6602 »
Fax: 978-443-9587 »
Email: customerservice@sudburywater.com

NEWS FEED

  • Level 1. Mandatory Non-essential Outdoor Water Restriction May 12, 2025
  • Sudbury Water District Reinforces Commitment to Water Quality During Drinking Water Week May 5, 2025
  • Planned Water Main Construction/Temporary Water Outage: Boston Post Road/Route 20 April 24, 2025

RESOURCES

  • Water Quality
  • Calculating My Water Bill
  • FAQS
  • Backflow Prevention

The Sudbury Water District is an independent municipal entity established by an Act of the Massachusetts Legislature in 1934.
It is separate and distinct from the Town of Sudbury, and is not affiliated with the Town of Sudbury’s Department of Public Works.

© 2025 Sudbury Water District

Page load link
Go to Top