FY2025:
- Completed the Raymond Road WTF/PFAS Filtration system in August 2024.
- Awarded contract for the East Street WTF/PFAS Filtration system to Barbato Construction. Project completion date is anticipated for August 2026.
- Evaluation and Preliminary Design for PFAS mitigation system for wells 4 & 6.
- Conducted a study/evaluation for an emergency and long-term water supply connection(s) with surrounding towns and the Massachusetts Water Resource Authority (MWRA).
- Participated in the MWRA Metrowest Expansion Study.
- Well 5 – preliminary design for well replacement. Funded via Housing Choice Grant Program.
- Installed 80-feet of new 12-inch ductile iron water main on Dutton Road, Peakham Road, and Boston Post Road for the Eversource High Voltage Line Project.
- Completed MassDEP requirement for lead Service Line inventory. Funded through MassDEP grant.
- Asset Management Program, 90% completed. Funded by MassDEP grant program.
- Installed 23 new fire hydrants on dead-end streets and cul-de-sacs in Town.
- Conducted a leak detection survey of the entire water distribution system. The survey is necessary to locate and eliminate leaks from the system.
- Participation in leak-detection pilot program with 50 sound listening devises securely mounted fire hydrant at various locations within Town.
- Completed Lead and Copper Sampling
- Completed UCMR 5 sampling.
- Updated Water GIS Mapping.
FY2026:
- Complete the East Street WTF/PFAS Filtration system project. The project completion date is anticipated for August 2026.
- Complete the design and bid ready documents for PFAS mitigation system for wells 4 & 6.
- Complete Asset Management Project.
- Design and bid ready documents for replacing the water main on Landham Road, from Boston Post Road to the Framingham town-line.
- Expansion of hydrant leak-detector units in Town.